
Aluminum Alloy Carbon Steel Pulley Wheel Trundle of Die Casting CNC Machining
Yuchen power transmission limited- Certification:CE, ISO
- Pulley Sizes:Type E
- Manufacturing Process:Casting
- Material:Alloy
- Surface Treatment:Oxygenation
- Application:Chemical Industry, Grain Transport, Mining Transport, Power Plant
Base Info
- Model NO.:YC
- Transport Package:Non-Fumigation
- Specification:500mm*500mm*500mm
- Trademark:YC
- Origin:China
- HS Code:7610900000
- Production Capacity:20000 PC,Month
Description
Certification 1. ISO9001-2008/ISO 9001:2008; 2. GB/T28001-2001(including all the standard of OHSAS18001:1999); 3. GB/T24001-2004/ISO 14001:2004; 4. GMC. MOQ As custimer's . Usually 10-12 tons for a 20'FT; 20-23 tons for a 40HQ. Free Samples YES Payment 1. T/T: 30% deposite, the balance will be paid before delivery; 2. L/C: the balance irrevocable L/C at sight. Delivery time 1. 15 days production ; 2. If opening mould, plus 10-20 days. OEM Available.

Manufactury workshop


Chemical Composition of Aluminum Alloy :
Alloy | Si | Fe | Cu | Mn | Mg | Zn | Ni | Sn | Al |
ADC12 | 9.6-12.0 | 0.3-0.6 | 3.0-3.5 | 0.3-0.5 | 0.2-0.3 | 0.6-0.9 | 0.2-0.5 | <0.3 | Al |
A380 | 7.5-9.5 | 1.3 | 3.0-4.0 | 0.5 | 0.1 | 3 | 0.5 | 0.35 | Al |
Products show

Manufactury workshop


FAQ
Q: Are you trading company or manufacturer ?
A: We are factory.
Q: How long is your delivery time?
A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
Q: Do you provide samples ? is it free or extra ?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
Q: What is your terms of payment ?
A: Payment 30%TT in advance. 70% T/T before shippment
My name card