Industrial Equipment & Components

Aluminum Alloy Carbon Steel Pulley Wheel Trundle of Die Casting CNC Machining

Yuchen power transmission limited
  • Certification:CE, ISO
  • Pulley Sizes:Type E
  • Manufacturing Process:Casting
  • Material:Alloy
  • Surface Treatment:Oxygenation
  • Application:Chemical Industry, Grain Transport, Mining Transport, Power Plant

Base Info

  • Model NO.:YC
  • Transport Package:Non-Fumigation
  • Specification:500mm*500mm*500mm
  • Trademark:YC
  • Origin:China
  • HS Code:7610900000
  • Production Capacity:20000 PC,Month

Description

Certification  1. ISO9001-2008/ISO 9001:2008;  2. GB/T28001-2001(including all the standard of OHSAS18001:1999);  3. GB/T24001-2004/ISO 14001:2004;  4. GMC. MOQAs custimer's .  Usually 10-12 tons for a 20'FT; 20-23 tons for a 40HQ.   Free  Samples YES Payment  1. T/T: 30% deposite, the balance will be paid before delivery;  2. L/C: the balance irrevocable L/C at sight. Delivery  time  1. 15 days production ;  2. If opening mould, plus 10-20 days. OEM  Available.

 

Chemical Composition of Aluminum Alloy :

 AlloySiFeCuMnMgZnNiSnAl
ADC129.6-12.00.3-0.63.0-3.50.3-0.50.2-0.30.6-0.90.2-0.5<0.3Al
A3807.5-9.51.33.0-4.00.50.130.50.35Al

 
Products show

  Aluminum Alloy Carbon Steel Pulley Wheel Trundle of Die Casting CNC Machining


       Aluminum Alloy Carbon Steel Pulley Wheel Trundle of Die Casting CNC Machining

     Aluminum Alloy Carbon Steel Pulley Wheel Trundle of Die Casting CNC Machining

    Manufactury workshop
    

     Aluminum Alloy Carbon Steel Pulley Wheel Trundle of Die Casting CNC Machining
   
      Aluminum Alloy Carbon Steel Pulley Wheel Trundle of Die Casting CNC Machining

  FAQ

Q: Are you trading company or manufacturer ?

A: We are factory.

Q: How long is your delivery time?

A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.

Q: Do you provide samples ? is it free or extra ?

A: Yes, we could offer the sample for free charge but do not pay the cost of freight.

Q: What is your terms of payment ?

A: Payment 30%TT in advance. 70% T/T before shippment

My name card