Industrial Equipment & Components

High Quality 9mm G1000 Carbon Steel Ball

Qingdao Tlead International Co., Ltd.

Base Info

Description

Basic Info.

Model NO. 9mm Transport Package Carton Specification 9mm Trademark HD Origin China Production Capacity 500tons

Product Description

BREIF INTRODUCTION:

We are professional steel ball producer  since 1997.

We supply various steel ball in carbon steel ball , chrome steel ball and SS ball.

1) Material:  Carbon steel AISI 1010-1015, high carbon steel AISI1085 and chrome steel AISI 52100.
2) Size: 1/8", 3/16", 5/32", 1/4",5/16", 3/8".7/32"
3) Grade: G1000,G500,G200,G100
4) Hardness: HRC58-63,HRA78-80
5) Packing: Industry packing with carton ,PP woven bags, drum and commercial packing include poly bags, plastic box, steel box for one gross.
High Quality 9mm G1000 Carbon Steel Ball

PACKAGING & SHIPPING:

Time :in 30 days (We will delivery goods to QINGDAO Port within 30 days after receive the 30% deposit or original LC.

MOQ :1 Metric Ton Per Size

Packing :

Standard Seaworthy Export Packing or packing as customer's requested:

1. Poly bag + Carton + Plywood box
2. Poly bag + Carton + Pallet
3. Poly bag + Woven Bag + Plywood box 
4. Poly bag + Woven Bag + Pallet
5. Poly bag + Woven Bag + Steel Drum

Note:Carton: Standard export carton. 
 Pallet: Wooden or Iron pallet with plastic film against moisture

Special Notes:Materials should be suitable for customer's order.Tolerances should be within the allowable range of the order.

Payment:30% deposit,  70% by T/T before loading or L/C at sight;
High Quality 9mm G1000 Carbon Steel Ball
FAQ:

Q: Are you trading company or manufacturer ?

A: We are professional factory of steel ball since 1997.

Q: How long is your delivery time?

A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.

Q: Do you provide samples ? is it free or extra ?

A: Yes, we could offer the sample for free charge but do not pay the cost of freight.

Q: What is your terms of payment ?

A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.